A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
Kai Watermeyer () and
Jürgen Zimmermann ()
Additional contact information
Kai Watermeyer: Clausthal University of Technology
Jürgen Zimmermann: Clausthal University of Technology
Journal of Scheduling, 2023, vol. 26, issue 1, No 7, 95-111
Abstract:
Abstract This paper deals with the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints with the objective to minimize the project duration. The consideration of partially renewable resources allows to integrate the decision about the availability of a resource for a specific time period into the scheduling process. Together with general temporal constraints, which permit to establish minimum and maximum time lags between activities, even more aspects of real-life projects can be taken into account. We present a branch-and-bound algorithm for the stated problem that is based on a serial schedule-generation scheme. For the first time it is shown how a dominance criterion can be applied on the associated generation scheme to reduce the start times in each scheduling step. To improve the performance of the solution procedure, we integrate consistency tests and lower bounds from the literature and devise new pruning techniques. In a comprehensive experimental performance analysis we compare our exact solution procedure with all available branch-and-bound algorithms for partially renewable resources. Additionally, we investigate a directly derived priority rule-based approximation method from our new enumeration scheme. The results of the computational study demonstrate the efficiency of our branch-and-bound algorithm and reveal that the derived approximation method is only suited to solve small- and medium-sized instances.
Keywords: Project scheduling; Branch and bound; Resource-constrained project scheduling; Partially renewable resources; Minimum and maximum time lags (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1007/s10951-022-00735-9 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:jsched:v:26:y:2023:i:1:d:10.1007_s10951-022-00735-9
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10951
DOI: 10.1007/s10951-022-00735-9
Access Statistics for this article
Journal of Scheduling is currently edited by Edmund Burke and Michael Pinedo
More articles in Journal of Scheduling from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().