Complexity of scheduling few types of jobs on related and unrelated machines

Martin Koutecký () and Johannes Zink ()
Additional contact information
Martin Koutecký: Charles University
Johannes Zink: Universität Würzburg

Journal of Scheduling, 2025, vol. 28, issue 1, No 6, 139-156

Abstract: Abstract The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector are among the oldest and most fundamental tasks in combinatorial optimization. Since all of these problems are in general NP-hard, much attention has been given to the regime where there is only a small number k of job types, but possibly the number of jobs n is large; this is the few job types, high-multiplicity regime. Despite many positive results, the hardness boundary of this regime was not understood until now. We show that makespan minimization on uniformly related machines ( $$Q|HM|C_{\max }$$ Q | H M | C max ) is NP-hard already with 6 job types, and that the related Cutting Stock problem is NP-hard already with 8 item types. For the more general unrelated machines model ( $$R|HM|C_{\max }$$ R | H M | C max ), we show that if the largest job size $$p_{\max }$$ p max or the number of jobs n is polynomially bounded in the instance size |I|, there are algorithms with complexity $$|I|^{{{\,\mathrm{\textrm{poly}}\,}}(k)}$$ | I | poly ( k ) . Our main result is that this is unlikely to be improved because $$Q||C_{\max }$$ Q | | C max is $$\mathsf {W[1]}$$ W [ 1 ] -hard parameterized by k already when n, $$p_{\max }$$ p max , and the numbers describing the machine speeds are polynomial in |I|; the same holds for $$R||C_{\max }$$ R | | C max (without machine speeds) when the job sizes matrix has rank 2. Our positive and negative results also extend to the objectives $$\ell _2$$ ℓ 2 -norm minimization of the load vector and, partially, sum of weighted completion times $$\sum w_j C_j$$ ∑ w j C j . Along the way, we answer affirmatively the question whether makespan minimization on identical machines ( $$P||C_{\max }$$ P | | C max ) is fixed-parameter tractable parameterized by k, extending our understanding of this fundamental problem. Together with our hardness results for $$Q||C_{\max }$$ Q | | C max , this implies that the complexity of $$P|HM|C_{\max }$$ P | H M | C max is the only remaining open case.

Keywords: High-multiplicity jobs; Cutting stock; Hardness; Parameterized complexity (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s10951-024-00827-8 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:jsched:v:28:y:2025:i:1:d:10.1007_s10951-024-00827-8

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10951

DOI: 10.1007/s10951-024-00827-8

Access Statistics for this article

Journal of Scheduling is currently edited by Edmund Burke and Michael Pinedo

More articles in Journal of Scheduling from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:jsched:v:28:y:2025:i:1:d:10.1007_s10951-024-00827-8