Scheduling chains with identical jobs and constant delays on a single machine
Peter Brucker (),
Sigrid Knust () and
Ceyda Oğuz ()
Mathematical Methods of Operations Research, 2006, vol. 63, issue 1, 63-75
Abstract:
In this paper we study the single-machine problem 1|chains(l), p j =p|∑ C j in which jobs with constant processing times and generalized precedence constraints in form of chains with constant delays are given. One has to schedule the jobs on a single machine such that all delays between consecutive jobs in a chain are satisfied and the sum of all completion times of the jobs is minimized. We show that this problem is polynomially solvable. Copyright Springer-Verlag 2006
Keywords: Scheduling; Time-lags; Delays; Complexity results (search for similar items in EconPapers)
Date: 2006
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1007/s00186-005-0014-8 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mathme:v:63:y:2006:i:1:p:63-75
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/00186
DOI: 10.1007/s00186-005-0014-8
Access Statistics for this article
Mathematical Methods of Operations Research is currently edited by Oliver Stein
More articles in Mathematical Methods of Operations Research from Springer, Gesellschaft für Operations Research (GOR), Nederlands Genootschap voor Besliskunde (NGB)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().