EconPapers    
Economics at your fingertips  
 

Determination of optimal production rate under price uncertainty—Sari Gunay gold mine, Iran

Parviz Sohrabi, Hesam Dehghani and Behshad Jodeiri Shokri ()
Additional contact information
Parviz Sohrabi: Hamedan University of Technology (HUT)
Hesam Dehghani: Hamedan University of Technology (HUT)
Behshad Jodeiri Shokri: Hamedan University of Technology (HUT)

Mineral Economics, 2022, vol. 35, issue 2, No 1, 187-201

Abstract: Abstract Due to the long life, most mining projects face the risk of the parameters such as mineral price, grade, and cost. Uncertainty can lead to unfavorable results of the decisions made by managers and mining investors. Therefore, this paper aims to determine the Sari Gunay gold mine’s production planning, considering the certainty and uncertainty over the mineral price. Finally, the proposed planning will lead to the allocation of fixed or variable production rates throughout the mine life. These findings were assessed by Taylor and Zwiagin methods with 22 different scenarios in all conditions, including (a) price certainty and uncertainty such as daily price, 3- and 5-year average, Monte Carlo simulation, and binomial tree; (b) decreasing, increasing, and fixed production rates; and (c) mine life conditions. The scenarios evaluated under the price certainty conditions (scenarios 1 to 12) have lower NPV values than those under the price uncertainty conditions. This is because the price is fixed throughout the mine life. Due to historical price data and high fluctuations of estimated prices, this method’s NPV values fluctuate more than other scenarios evaluated by the Monte Carlo simulation. The binomial tree method scenarios have the lowest NPV value’s fluctuation because the fluctuation of the estimated prices is controlled, and the highest NPV values are related to this method. Out of the 22 scenarios, scenario 17 has the highest NPV value ($512,642,774). According to this scenario, the mine plan is determined, and the annual production rate is reduced to 3,241,977 tons in the first year and 270,165 tons in the last year with the Taylor life of 12 years.

Keywords: Production planning; mineral price uncertainty; Monte Carlo simulation; binomial tree (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: Track citations by RSS feed

Downloads: (external link)
http://link.springer.com/10.1007/s13563-021-00253-8 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:minecn:v:35:y:2022:i:2:d:10.1007_s13563-021-00253-8

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/13563

DOI: 10.1007/s13563-021-00253-8

Access Statistics for this article

Mineral Economics is currently edited by Magnus Ericsson and Patrik Söderholm

More articles in Mineral Economics from Springer, Raw Materials Group (RMG), Luleå University of Technology
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2022-07-30
Handle: RePEc:spr:minecn:v:35:y:2022:i:2:d:10.1007_s13563-021-00253-8