Capacity planning in open-pit mines under economies of scale and block sequence considerations

M. Balci () and M. Kumral ()
Additional contact information
M. Balci: McGill University
M. Kumral: McGill University

Mineral Economics, 2025, vol. 38, issue 2, No 12, 425-443

Abstract: Abstract Capacity planning is a particular problem in the minerals industry because it depends on the heterogeneity and accessibility of the ore in the deposit, as well as on demand. If the ore is uniformly distributed within the deposit, capacity planning will be a function of project financing and demand. However, in many deposits, the ore is unevenly distributed, and it is not possible to access the ore as desired. Overlying ore and waste, considering slope angles, should be extracted earlier to access specific ore locations. Also, measuring the degree of EoS, the ratio of variable costs to total cost, called the “capacity factor,” also affects capacity planning. This research explores the critical relationship capacity planning, block sequencing, and economies of scale (EoS). By integrating EoS into a comprehensive cost-capacity relationship framework, a novel model that enhances traditional mine planning methodologies is proposed. A case study of an old gold deposit demonstrates the proposed model’s practical applicability. Results show that lower capacity factors (i.e., high fixed and low variable operating costs) for mining systems associated with large-capacity mining equipment significantly enhance net present value (NPV) compared to small-capacity equipment. On the other hand, the capacity factor for mineral processing systems has a less significant effect on NPV maximization when compared with the mining capacity factor. This emphasizes that the importance of EoS in mining systems is higher than in mineral processing systems. Even though the analysis suggests that the optimum capacity and the related NPV vary with different degrees of EoS, NPV is maximized with lower capacity factors for the mining system and moderate capacity factors for the mineral processing system. This observation highlights the critical need for accurate estimation of fixed and variable costs, as well as the degree of EoS, for a project.

Keywords: Economies of scale; Capacity planning; Block sequencing; Open-pit mining; Mineral Economics (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s13563-025-00495-w Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:minecn:v:38:y:2025:i:2:d:10.1007_s13563-025-00495-w

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/13563

DOI: 10.1007/s13563-025-00495-w

Access Statistics for this article

Mineral Economics is currently edited by Magnus Ericsson and Patrik Söderholm

More articles in Mineral Economics from Springer, Raw Materials Group (RMG), Luleå University of Technology
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-05-17
Handle: RePEc:spr:minecn:v:38:y:2025:i:2:d:10.1007_s13563-025-00495-w