EconPapers    
Economics at your fingertips  
 

Epistemic uncertainty in probabilistic estimates of seismic risk resulting from multiple hazard models

M. C. Marulanda (), J. C. Llera (), G. A. Bernal () and O. D. Cardona ()
Additional contact information
M. C. Marulanda: CIGIDEN, National Research Center for Integrated Natural Disaster Management CONICYT/FONDAP/15110017
J. C. Llera: Pontificia Universidad Católica de Chile
G. A. Bernal: Universidad Nacional de Colombia
O. D. Cardona: Universidad Nacional de Colombia

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, 2021, vol. 108, issue 3, No 37, 3203-3227

Abstract: Abstract Quite frequently, catastrophes impact populated areas of the world, and hence the need for proper risk evaluations that support mitigation and management processes. Because of the uncertain nature of extreme natural hazards and lack of data, forecasts of the potential damage and losses before the event happens are needed. Catastrophe (CAT) models build on scenarios that represent all possible realizations of the hazard in terms of recurrence and intensity. Probabilistic risk models require the characterization of the hazards, the exposure model for the infrastructure, and its vulnerability. The main objective of this research is to compare loss exceedance curves, probable maximum loss curves, and average annual losses using four different available seismic hazard models for Chile. To isolate the effect of changing the hazard model in the risk results, the exposure and vulnerability information is fixed to the one available from the Global Assessment Report, GAR 15, and GAR ATLAS 2017. Imprecise probability theory, logic trees, and frequency and severity blends used by CAT modelers are the approaches applied and compared herein to propose either model blending or an interval of possible realizations. Both types of results have pros and cons. Blended results are point estimates which make them useful in a more traditional way, but their computation necessarily implies assigning weights to the models according to the modeler preferences. On the other hand, raw intervals of variability (without any knowledge of how the variable is distributed inside) are more transparent, as they simply state the bound of what is known without any preference, but their use is less understood among practitioners and could be even impractical.

Keywords: Probabilistic risk assessment; Uncertainty quantification; Risk model blending; Loss exceedance curves; Hazard models (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://link.springer.com/10.1007/s11069-021-04820-8 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:nathaz:v:108:y:2021:i:3:d:10.1007_s11069-021-04820-8

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11069

DOI: 10.1007/s11069-021-04820-8

Access Statistics for this article

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards is currently edited by Thomas Glade, Tad S. Murty and Vladimír Schenk

More articles in Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards from Springer, International Society for the Prevention and Mitigation of Natural Hazards
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:nathaz:v:108:y:2021:i:3:d:10.1007_s11069-021-04820-8