EconPapers    
Economics at your fingertips  
 

Flood hydrograph coincidence analysis of the upper Yangtze River and Dongting Lake, China

Chao Zhang (), Changming Ji (), Yi Wang () and Qian Xiao ()
Additional contact information
Chao Zhang: North China Electric Power University
Changming Ji: North China Electric Power University
Yi Wang: North China Electric Power University
Qian Xiao: North China Electric Power University

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, 2022, vol. 110, issue 2, No 22, 1339-1360

Abstract: Abstract In hydrological research, flood events can be analyzed by flood hydrograph coincidence. The duration of the flood hydrograph is a key variable to calculate the flood hydrograph coincidence risk probability and determining whether flood hydrograph coincidence occurs, while the actual duration of the flood hydrograph is neglected in most of existing related research. This paper creatively proposes a novel method to analyze the flood hydrograph coincidence risk probability by establishing a five-dimensional joint distribution of flood volumes, durations and interval time for two hydrologic stations. More specifically, taking the annual maximum flood of the upper Yangtze River and input from Dongting Lake as an example, the Pearson Type III and the mixed von Mises distributions were used to establish the marginal distribution of flood volumes, flood duration and interval time. Subsequently, the five-dimensional joint distribution based on vine copula was established to analyze the flood hydrograph coincidence risk probability. The results were verified by comparison with a historical flood sequence, which show that during 1951–2002, the hydrograph coincidence probabilities corresponding to its flood event coincidence volumes of 2.00 × 1011 m3, 4.00 × 1011 m3, and 6.00 × 1011 m3 are 0.213, 0.123, and 0.049, respectively. It has provided theoretical support for flood control safety and risk management in the middle and lower Yangtze River. This study also demonstrates the significant beneficial role of regulation by the Three Gorges Water Conservancy Project in mitigating flood risk of the Yangtze River. The hydrograph coincidence probability corresponding to its flood event coincidence volume of 2.00 × 1011 m3 has decreased by 0.141.

Keywords: Flood hydrograph coincidence; Hydrological extremes; Joint distribution; Vine copula; Risk probability; Yangtze River Basin (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s11069-021-04993-2 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:nathaz:v:110:y:2022:i:2:d:10.1007_s11069-021-04993-2

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11069

DOI: 10.1007/s11069-021-04993-2

Access Statistics for this article

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards is currently edited by Thomas Glade, Tad S. Murty and Vladimír Schenk

More articles in Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards from Springer, International Society for the Prevention and Mitigation of Natural Hazards
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:nathaz:v:110:y:2022:i:2:d:10.1007_s11069-021-04993-2