A prototype experiment of debris flow control with energy dissipation structures
Zhao Wang (),
Lijian Qi () and
Xuzhao Wang ()
Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, 2012, vol. 60, issue 3, 989 pages
Abstract:
Large-volume debris flow events are defined when the volume of solid materials exceeds 1 million m 3 . Traditional engineering measures, such as check dams, diversion channels, and flumes, are effective for normal debris flow control but are not sufficient to control large-volume debris flows. Experiments were conducted with an artificial step-pool system on the new Wenjiagou Gully to mitigate large-volume debris flows. The old Wenjiagou Gully was buried by 81.6 million m 3 of loose solid material created by a landslide that was triggered by the Wenchuan earthquake on May 12, 2008. The new gully was formed during the scouring process caused by debris flows in 2008. Large-volume debris flows were initiated by rainstorm flood with high kinetic energy. The artificial step-pool system was constructed with huge and big boulders on the new Wenjiagou Gully in 2009. The step-pool system dissipated flow energy in steps and hydraulic jumps. Analysis proved that the step-pool system dissipated two-third of the kinetic energy of flow; thus, the critical discharge for triggering debris flow increased threefold. Due to the step-pool system maximized the flow resistance and protected the bed sediment and banks from erosion, the rainstorm floods in 2009 did not trigger debris flows. In 2010, the step-pool system was replaced with 20 check dams. Huge boulders were broken into small pieces of diameter less than 0.5 m and were used as building materials for the 20 dams. Without the protection of the step-pool system, a rainstorm flood scoured the base of the dams and caused failures for all of the 20 check dams in August 2010. The flow incised the gully bed by 50 m. The loose bank materials slid into the flow mixed with water and formed a large-volume debris flow with a volume of 4.5 million m 3 . Many houses were buried by the debris flow, and 12 people were killed. Comparison of the two strategies proved that energy dissipation structures are necessary for controlling large-volume debris flows. Check dams, if they are stable, may reduce the potential of bank failures and control debris flows. The step-pool system dissipates flow energy and control gully bed incision and bank failure. A combination of check dams and step-pool systems may be the most effective for mitigating debris flows. Copyright Springer Science+Business Media B.V. 2012
Keywords: Debris flow; Energy dissipation; Step-pool system; Check dams; Landslide (search for similar items in EconPapers)
Date: 2012
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1007/s11069-011-9878-5 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:nathaz:v:60:y:2012:i:3:p:971-989
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11069
DOI: 10.1007/s11069-011-9878-5
Access Statistics for this article
Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards is currently edited by Thomas Glade, Tad S. Murty and Vladimír Schenk
More articles in Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards from Springer, International Society for the Prevention and Mitigation of Natural Hazards
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().