RETRACTED ARTICLE: Adapting project management method and ANFIS strategy for variables selection and analyzing wind turbine wake effect
Dalibor Petković (),
Siti Hafizah Ab Hamid,
Žarko Ćojbašić and
Nenad T. Pavlović
Additional contact information
Dalibor Petković: University of Niš
Siti Hafizah Ab Hamid: University of Malaya
Žarko Ćojbašić: University of Niš
Nenad T. Pavlović: University of Niš
Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, 2014, vol. 74, issue 2, No 8, 463-475
Abstract:
Abstract We present a project management methodology designed for the selection of wind turbines wake effect most influential parameters, who need to run wind farm project for large energy conversion. Very frequently, the managers of these projects are not project management professionals, so they need guidance to have autonomy, using minimal time and documentation resources. Therefore, agile method is adapted to assist the project management. Wind energy poses challenges such as the reduction in the wind speed due to the wake effect by other turbines. If a turbine is within the area of turbulence caused by another turbine, or the area behind another turbine, the wind speed suffers a reduction and, therefore, there is a decrease in the production of electricity. In order to increase the efficiency of a wind farm, analyzing the parameters, which have influence on the wake effect, is one of the focal research areas. To maximize the power produced in a wind farm, it is important to determine and analyze the most influential factors on the wake effects or wake wind speeds since the effect has most influence on the produced power. This procedure is typically called variable selection, and it corresponds to finding a subset of the full set of recorded variables that exhibits good predictive abilities. In this study, architecture for modeling complex systems in function approximation and regression was used, based on using adaptive neuro-fuzzy inference system (ANFIS). Variable searching using the ANFIS network was performed to determine how the five parameters affect the wake wind speed. Our article answers the call for renewing the theoretical bases of wind farm project management in order to overcome the problems that stem from the application of methods based on decision-rationality norms, which bracket the complexity of action and interactions in projects.
Keywords: Wind turbine; ANFIS; Project management; Wake effect; Variable selection (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://link.springer.com/10.1007/s11069-014-1189-1 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:nathaz:v:74:y:2014:i:2:d:10.1007_s11069-014-1189-1
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11069
DOI: 10.1007/s11069-014-1189-1
Access Statistics for this article
Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards is currently edited by Thomas Glade, Tad S. Murty and Vladimír Schenk
More articles in Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards from Springer, International Society for the Prevention and Mitigation of Natural Hazards
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().