EconPapers    
Economics at your fingertips  
 

Incorporating Hydrologic Routing into Reservoir Operation Models: Implications for Hydropower Production Planning

Nicholas Zmijewski (), Andrea Bottacin-Busolin and Anders Wörman
Additional contact information
Nicholas Zmijewski: Royal Institute of Technology (KTH)
Andrea Bottacin-Busolin: University of Manchester
Anders Wörman: Royal Institute of Technology (KTH)

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2016, vol. 30, issue 2, No 11, 623-640

Abstract: Abstract Increased reliance on variable and intermittent energy sources is likely to lead to a change in the production strategies of hydropower, thereby increasing the importance of accurate forecasting of production. For optimization models applied to water reservoirs, the computational cost increases with the number of reservoirs and future time-steps considered, often requiring simplification of the physical description of the flow dynamics. Here it is demonstrated that deficiency of the model of the flow dynamics on stream-reaches gives rise to errors in short-term planning, which leads to sub-optimal production. Here a simplified hydraulic model based on the kinematic-diffusion wave model was incorporated in the optimization of reservoir production planning. The time-lag distributions of the streams were evaluated for River Dalälven and implemented in a computationally efficient form of the kinematic-diffusion wave equation incorporated in a production optimization algorithm for a series of reservoirs. Compared to using a single time-lag for the water transfer on flow reaches between hydropower stations, the wave diffusion was found to affect the management as a deviation between the actual production and the planned production. The deviation was found to increase with increasing short-term regulation and decreasing Peclet number below about 10. For a sufficiently high Peclet number and long wavelength characterizing individual stream reaches, the distribution of time-lags become sufficiently narrow to motivate being replaced by a simpler description such as the constant time-lag.

Keywords: Simplified routing; Hydropower; Water resource optimization; Time-lag constrained (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s11269-015-1181-x Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:30:y:2016:i:2:d:10.1007_s11269-015-1181-x

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-015-1181-x

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:30:y:2016:i:2:d:10.1007_s11269-015-1181-x