EconPapers    
Economics at your fingertips  
 

Risk Assessment of Agricultural Water Conveyance and Delivery Systems by Fuzzy Fault Tree Analysis Method

Morteza Babaei (), Abbas Roozbahani () and S. Mehdy Hashemy Shahdany ()
Additional contact information
Morteza Babaei: University of Tehran
Abbas Roozbahani: University of Tehran
S. Mehdy Hashemy Shahdany: University of Tehran

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2018, vol. 32, issue 12, No 17, 4079-4101

Abstract: Abstract Improving the efficiency of main Agricultural Water Conveyance and Delivery Systems (AWCDS) has a significant impact on improving water productivity in agriculture. Therefore, risk assessment of mentioned systems is necessary to increase reliability of operational performance. Accordingly, this study for the first time presents a unique framework to assess the adequacy, equity, and efficiency of agricultural water distribution and delivery risk assessment within AWCDS. In this way, the Fault Tree Analysis (FTA) technique is employed for risk assessment of “undesirability of supply and delivery”. The west Dez main irrigation canal in Khuzestan province of Iran was determined as the case study of the research. A set of questionnaires filled up by managers and experts of this irrigation district, the failure probabilities of the basic events are gathered in the form of linguistic terms. Due to the uncertainty in these terms, the system’s risk assessment to determine the failure probability of the top event was performed based on Fuzzy Fault Tree Analysis method (FFTA). The results of the study showed that the failure probability in the fuzzy approach is 0.55 which is roughly 0.15 more than crisp approach. Also, the rating of the basic events based on their contribution to the occurrence of the top event was carried out using importance measures. Five major events were identified with an emphasis on operational and socio-economic issues related to distribution and delivery of water. Comparing the results of risk assessment with the mathematical model reveals that the latter’s failure probability will be less than the system’s FTA due to non-consideration of some important factors.

Keywords: FFTA; Risk assessment; Irrigation canals; Adequacy; Equity; Efficiency (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)

Downloads: (external link)
http://link.springer.com/10.1007/s11269-018-2042-1 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:32:y:2018:i:12:d:10.1007_s11269-018-2042-1

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-018-2042-1

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:32:y:2018:i:12:d:10.1007_s11269-018-2042-1