EconPapers    
Economics at your fingertips  
 

The Impact of Uncertainty Factors on Optimal Sizing and Costs of Low-Impact Development: a Case Study from Beijing, China

Jinjin Gu, Quan Zhang, Dazhi Gu (), Qingguo Zhang and Xiao Pu
Additional contact information
Jinjin Gu: Hefei University of Technology
Quan Zhang: Hefei University of Technology
Dazhi Gu: Hefei University of Technology
Qingguo Zhang: Anhui Agricultural University
Xiao Pu: Capital Normal University

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2018, vol. 32, issue 13, No 5, 4217-4238

Abstract: Abstract The facility allocation optimization of Low-impact development (LID) optimization has been used widely to prevent and tackle urban storm water pollution. However, uncertainties existing in nature and human society would influence the size and total cost of LID. To study the influence of the uncertainties on LID optimization allocation, the research develops the model of LID optimization allocation under uncertainty. The principle of the model is establishing primarily the LID optimization model based on certain numbers and identifying the uncertainties. Hence, the model integrates the uncertainty programming, including interval programming, fuzzy programming, stochastic programming, chance constraint programming (CCP) and scenario programming. The model of LID optimization allocation under uncertainty is established with the conditions. The developed uncertainty model tackles multiple types of uncertainties, and the results of the model are in the interval form in multiple scenarios. The model analyses the effects of uncertainties on the size and total cost of LID in this way. The study shows that the uncertainties in rainfall, infiltration rate, release coefficient, funds and unit price all have a significant influence on the size and total cost of LID when these uncertainty factors overlay. A higher violation probability of CCP corresponding to LID sizing results to a wider interval number of the corresponding uncertainty. The developed method of the study is universal, and the method could be extended to other cases of LID optimization allocation to speculate the influence of uncertainties.

Keywords: Low-impact development; Optimization; Uncertainty; Sizing; Cost (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://link.springer.com/10.1007/s11269-018-2040-3 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:32:y:2018:i:13:d:10.1007_s11269-018-2040-3

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-018-2040-3

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:32:y:2018:i:13:d:10.1007_s11269-018-2040-3