Research on Scale Demonstration Technology of Inter Basin Water Transfer Project in Agricultural Irrigation
Jianhua Wang,
Baodeng Hou (),
Yong Zhao,
Weihua Xiao and
Fan Lu
Additional contact information
Jianhua Wang: State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research
Baodeng Hou: State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research
Yong Zhao: State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research
Weihua Xiao: State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research
Fan Lu: State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research
Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2021, vol. 35, issue 15, No 11, 5243-5258
Abstract:
Abstract Inter-basin water transfer projects are powerful measures for resolving the uneven distribution of water resources, but their scale directly affects the associated investment and income. Therefore, determining the scale of an inter-basin water transfer project is essential. Based on the inter-basin agricultural water transfer project in the Sanjiang Plain, Northeast China, combined with the suitable development scale of the irrigation area with the joint allocation of existing water sources, this research proposes a technique to demonstrate the scale of an inter-basin water transfer project based on dynamic trial feedback under the condition of the optimization method of despiking of the groundwater allocation; the water transfer project scale is demonstrated for each section in reverse order. According to the water demand prediction results in the study area, the scale of water transfer project BC is demonstrated, and the scale of water transfer project AB is demonstrated on the basis of the BC scale. The final AB and BC water transfer scales decrease by 15% and 13%, respectively; compared with the conventional method under the premise that the water supply guarantee rate is 75%. When the water is transferred, the process is stable, and the utilization rate of the canal is high, thereby saving investment funds and facilitating project scheduling and management.
Keywords: Water transfer project; Dynamic trial feedback; Scale demonstration; Despiking utilization; Water allocation; Sanjiang Plain (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1007/s11269-021-02999-w Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:35:y:2021:i:15:d:10.1007_s11269-021-02999-w
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269
DOI: 10.1007/s11269-021-02999-w
Access Statistics for this article
Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris
More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().