Uncertainty Analysis of Flood Control Design Under Multiple Floods

Yuming Huang, Yanjie Li, Min Liu, Liang Xiao, Fuwan Gan () and Jian Jiao
Additional contact information
Yuming Huang: Wuhan University
Yanjie Li: Guangxi University
Min Liu: Guangxi University
Liang Xiao: Guangxi University
Fuwan Gan: Guangxi University
Jian Jiao: Nanjing Hydraulic Research Institute

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2022, vol. 36, issue 4, No 3, 1175-1189

Abstract: Abstract Hydraulic engineerings built on tributaries at the confluence of main and branch streams are significant to river management and runoff regulation. The Flood Control Design Level (FCDL) calculations for these works are directly influenced by tributary floods and supporting effects from the mainstream. However, the determination of design level under main and tributary floods has not been well investigated. To address this issue, the authors proposed a Copula-based approach to analyze the design level under multiple runoff discharge with a case study of the Guiping Shipping Hub(GPSH). The proposed method is compared with the conventional multivariate hydrological elements analysis approach, and the sampling uncertainty is also studied. The results showed that the joint distribution of main and tributary floods is well modeled by Clayton Copula, with PE3s as the best-fit marginal distributions. Furthermore, the different roles of main and branch fluxes in design level calculation can be identified by the offered Flood Control return period(FCRP). And the design levels conducted by the FCRP can avoid the situation over-or-under performed by the OR or AND RP. Moreover, flood combinations uncertainty analysis indicates that the uncertainty of the joint design combinations decreases with the increase of sample size n but increases with the rise of the design T. Finally, the 95% confidence interval and standard deviation of the design level calculated by FCRP are smaller than that of OR RP, which means the FCRP can reduce uncertainty under multiple floods. These results suggest that the proposed FCRP provides an appropriate approach for determining the design level under combined fluxes and serves as a reference for engineering practice.

Keywords: Multiple floods; Copula; Flood control design level; Return period; Uncertainty analysis (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://link.springer.com/10.1007/s11269-022-03066-8 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:36:y:2022:i:4:d:10.1007_s11269-022-03066-8

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-022-03066-8

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:36:y:2022:i:4:d:10.1007_s11269-022-03066-8