Development of a New Simulation Model for the Reservoir Hydropower Generation
Rahim Zahedi (),
Reza Eskandarpanah,
Mohammadhossein Akbari,
Nima Rezaei,
Paniz Mazloumin and
Omid Noudeh Farahani
Additional contact information
Rahim Zahedi: University of Tehran
Reza Eskandarpanah: Islamic Azad University Science and Research Branch
Mohammadhossein Akbari: Islamic Azad University Science and Research Branch
Nima Rezaei: Islamic Azad University Science and Research Branch
Paniz Mazloumin: Islamic Azad University
Omid Noudeh Farahani: Faran Mehr Danesh University
Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2022, vol. 36, issue 7, No 7, 2256 pages
Abstract:
Abstract Hydroelectric power development plans are of great importance in today’s world, due to the urgency of access to clean energy resources. Hydroelectric power plants are great potentials for power generation around the world which produce less environmental problems. Hydroelectric power energy has covered 24% of the electrical energy in 2013. The proportion of this kind of energy is increasing rapidly. The amount of energy produced in different seasons of the year and different hours of the day is one of the most important issues in water plants. In other words, determining the capacity of installation (design discharge) is one of the important factors in the design of power plants. In this research, a developed algorithm for simulating hydropower energy production has been developed using MATLAB application. This developed model has been used for hydropower modeling. In such a situation, simulating energy production of the dam has been conducted for different power plant installation capacity and finally with applying reliability index of 90%, the installation capacity of the power plant equals 2.7 Kilowatt. In this installation capacity, initial energy and surplus has occurred in most months. Furthermore, in 33% of cases that the reservoir is in its maximum balance, surplus energy has been generated. Moreover, the scale of initial energy and the average surplus energy respectively equals to 20.80 and 13.2 Gigawatt hours annually on 24-h basis. By changing the input variables, this algorithm and the developed model can be applied in any single hydropower reservoir system.
Keywords: Hydroelectric power; Reliability; Installation capacity; Initial and surplus energy (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s11269-022-03138-9 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:36:y:2022:i:7:d:10.1007_s11269-022-03138-9
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269
DOI: 10.1007/s11269-022-03138-9
Access Statistics for this article
Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris
More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().