EconPapers    
Economics at your fingertips  
 

The causal relationship between construction workload and construction price

Fraser Dorward, Akintola Akintoye and Cliff Hardcastle

Applied Economics Letters, 1998, vol. 5, issue 1, 15-18

Abstract: Based on the Engle-Granger (1987) methodology for cointegration and error correction mechanism models the paper examines causal relationships between the UK construction workload and price. The model tests the intuitive belief that the construction price (tender price index) is a long run determinant of construction workload (new orders) and that the relationship is constantly correcting itself back on to this long run path. The results suggest that there is a relationship between the variables but a very weak one.

Date: 1998
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.informaworld.com/openurl?genre=article& ... 40C6AD35DC6213A474B5 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:apeclt:v:5:y:1998:i:1:p:15-18

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RAEL20

DOI: 10.1080/758540119

Access Statistics for this article

Applied Economics Letters is currently edited by Anita Phillips

More articles in Applied Economics Letters from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:apeclt:v:5:y:1998:i:1:p:15-18