Cost and schedule overruns in large hydropower dams: an assessment of projects completed since 2000

Judith Plummer Braeckman, Tim Disselhoff and Julian Kirchherr

International Journal of Water Resources Development, 2020, vol. 36, issue 5, 839-854

Abstract: This paper presents novel data on cost and schedule overruns in recent dam projects started and completed since 2000 and compares them with pre-existing data sets on projects started before 2000. Combining these data, a meta-data set was created of 184 cost overrun and 191 time overrun data points. For post-2000 projects, the average cost overrun was 33% and schedule overrun was 18% as compared with 46% and 37% respectively for pre-2000 projects. While a decrease in the averages was observed, the change in cost overruns is not statistically significant, whereas the change in time overruns is significant.

Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1080/07900627.2019.1568232 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:cijwxx:v:36:y:2020:i:5:p:839-854

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/cijw20

DOI: 10.1080/07900627.2019.1568232

Access Statistics for this article

International Journal of Water Resources Development is currently edited by Cecilia Tortajada

More articles in International Journal of Water Resources Development from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:cijwxx:v:36:y:2020:i:5:p:839-854