Estimating project and activity duration: a risk management approach using network analysis

Nashwan Dawood

Construction Management and Economics, 1998, vol. 16, issue 1, 41-48

Abstract: Variations in the durations of activities are commonplace in the construction industry. This is due to the fact that the construction industry is influenced greatly by variations in weather, productivity of labour and plant, and quality of materials. Stochastic network analysis has been used by previous researchers to model variations in activities and produce more effective and reliable project duration estimates. A number of techniques have been developed in previous literature to solve the uncertain nature of networks, these are: PERT (program evaluation and review techniques), PNET (probabilistic network evaluation technique), NRB, (narrow reliability bounds methods) and MCS (Monte Carlo simulation). Although these techniques have proved to be useful in modelling variations in activities, dependence of activity duration is not considered. This can have a severe impact on realistically modelling projects. In this context, the objective of the present research is to develop a methodology that can accurately model activity dependence and realistically predict project duration using a risk management approach. A simulation model has been developed to encapsulate the methodology and run experimental work. In order to achieve this, the following tasks are tackled: identify risk factors that cause activity variations using literature reviews and conducting interviews with contractors; model risk factors and their influence on activity variations through conducting case studies and identifying any dependence between them; develop a computer based simulation model that uses a modified Monte Carlo technique to model activity duration and dependence of risk factors; and run experimental work to validate and verify the model.

Keywords: Network Analysis; Monte Carlo Simulation; Pert; Stochastic Analysis (search for similar items in EconPapers)
Date: 1998
References: View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461998372574 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:16:y:1998:i:1:p:41-48

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/014461998372574

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:16:y:1998:i:1:p:41-48