EconPapers    
Economics at your fingertips  
 

Continuous and combined event-process models for simulating pipeline construction

Jingsheng Shi and Simaan Abourizk

Construction Management and Economics, 1998, vol. 16, issue 4, 489-498

Abstract: A continuous model and a combined event-process discrete model are developed by employing the Slam II general purpose simulation language. The continuous model addressed the on-going progress of the construction process on a higher level; and the combined event-process discrete model describes the pipeline construction on the operational level. Resource sharing and related issues also are investigated in the two models through an actual gas line project adopted for the purpose of this research. A comparison of the two models provides insights into the modelling approaches. It is concluded that the combined event-process model is more flexible and more powerful for modelling complex construction operations than the continuous model, but at the price of requiring a better understanding of the actual operations and more detailed information.

Keywords: Linear Construction; Pipeline Construction; Computer Simulation; Modelling; Planning; Slam Ii; Slamsystem (search for similar items in EconPapers)
Date: 1998
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461998372268 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:16:y:1998:i:4:p:489-498

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/014461998372268

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:16:y:1998:i:4:p:489-498