Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors
D. G. Proverbs,
G. D. Holt and
P. O. Olomolaiye
Construction Management and Economics, 1999, vol. 17, issue 1, 45-52
Abstract:
Recent investigations concerning the productivity of the UK construction industry and its performance compared with other European and world-wide nations have reported conflicting findings. These investigations have utilized various methodologies in attempting to measure and compare productivity levels. The present investigation uses a customized method to gauge the productivity at site level of three European national construction industries, namely Germany, France and the UK. Analysis of variance is employed to compare the productivity rates used by contractors' planning engineers for a specific concreting operation. The performance of UK contractors is found to be more disparate than those of contractors in either France or Germany. Although leading UK contractors can compete with the best on the continent, there are a number of companies whose performance is far worse than any in France and Germany, due mainly to the construction methods used by UK contractors. It is concluded therefore, that a best practice recommenda9 tion for UK contractors would be for them to avoid using traditional timber formwork methods to beams, and instead adopt more productive approaches afforded using either proprietary or prefabricated systems.
Keywords: Productivity Rates; Formwork; European Comparison; Construction Methods; Analysis Of Variance (search for similar items in EconPapers)
Date: 1999
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461999371817 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:17:y:1999:i:1:p:45-52
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/014461999371817
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().