EconPapers    
Economics at your fingertips  
 

Modelling and predicting construction durations in Hong Kong public housing

Daniel Chan and Mohan Kumaraswamy

Construction Management and Economics, 1999, vol. 17, issue 3, 351-362

Abstract: Construction time performance is provoking world-wide concern and discussion within the industry. This paper reports the results of a survey in the fourth stage of an investigation seeking to identify a set of significant variables influencing construction durations of projects in Hong Kong, the stage addressing the formulation of standard norms for overall construction durations of public housing projects by modelling the primary work packages in the building process, namely piling, pile caps/raft, superstructure, E&M services, finishes and their respective sequential start-start lag times, on the basis of the identified groups of critical factors. Data were collected from a sample of 56 standard 'Harmony' type domestic blocks of the Hong Kong Housing Authority; (the 'Harmony' series of block design having become popular for average quality public housing blocks in the 1990s, ranging from 30 to 40 storeys and containing about 16 residential units on each floor). These data were analysed through a series of multiple linear regression exercises that helped to establish the time prediction model. This model was then tested and validated using information from a further nine projects from the Housing Authority. Both the usefulness and shortcomings of the model are briefly presented and discussed. It is concluded that the model is applicable to the public housing industry in Hong Kong, and that the methodology used may be applied to develop similarly useful models in other subsectors, and in other countries.

Keywords: Modelling; Predicting; Construction Durations; Hong Kong Public Housing; Multiple Linear Regression (search for similar items in EconPapers)
Date: 1999
References: View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461999371556 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:17:y:1999:i:3:p:351-362

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/014461999371556

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:17:y:1999:i:3:p:351-362