A quantitative study of post contract award design changes in construction
I. D. Cox,
J. P. Morris,
J. H. Rogerson and
G. E. Jared
Construction Management and Economics, 1999, vol. 17, issue 4, 427-439
Abstract:
The investigation reported forms part of a wider study into the applicability of design for manufacture (DFM) thinking to the total construction process, and the ways in which this could be implemented. Historical data from change order request procedures were examined for several case studies which were considered to be successful projects. These procedures are intended to capture information about design modifications, and thus can be considered to be analogous to the rework procedures used in manufacturing. It was found that in monetary terms alone, the direct cost of post contract design changes amounts to 5.1-7.6% of the total project cost. Although the case studies used here were a convenience sample, the typical financial opportunity for controlling design changes better is likely to be considerably greater than this. Frequently cited reasons for design changes included: employer has changed his requirements, designer's omission in tender documents and new information on existing site conditions. Little commonality between case studies was found at the work package level. In contrast to manufacturing, the availability and accessibility of data relating to rework is problematic.
Keywords: Design For Manufacture Dfm; Design Changes; Change Order; Design; Process Mapping (search for similar items in EconPapers)
Date: 1999
References: View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461999371358 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:17:y:1999:i:4:p:427-439
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/014461999371358
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().