EconPapers    
Economics at your fingertips  
 

Allocation of contingency in activity duration networks

Terry Williams

Construction Management and Economics, 1999, vol. 17, issue 4, 441-447

Abstract: This paper describes a method for apportioning contingency in a probabilistic network. It distinguishes between two requirements for contingency: for high variance crucial activities, and for high float noncritical activities. This enables a logical two-step apportionment, the first based upon the idea of 'cruciality', which has become established as an important indicator of an activity's importance in risk terms, and the second based upon standard ideas about float. A numerical example is given based on data used by previous work, so that a comparison of the methods can be made.

Keywords: Network Analysis; Stochastic Networks; Construction Planning; Cpm; Contingency (search for similar items in EconPapers)
Date: 1999
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461999371367 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:17:y:1999:i:4:p:441-447

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/014461999371367

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:17:y:1999:i:4:p:441-447