Modelling the dynamics of design error induced rework in construction

Peter Love, Purnendu Mandal, Jim Smith and Heng Li

Construction Management and Economics, 2000, vol. 18, issue 5, 567-574

Abstract: Rework that is experienced in construction projects is often caused by errors made during the design process. Factors that contribute to design errors are identified and used to design and develop a systems dynamics model, which is used to simulate a number of practical scenarios that can be used to reduce design errors and rework. The model presented in this paper can enable design and project managers to understand better the process of design documentation and how design errors occur in construction projects.

Keywords: System Dynamics Design Management Time Boxing Design Errors Rework (search for similar items in EconPapers)
Date: 2000
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461900407374 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:18:y:2000:i:5:p:567-574

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/014461900407374

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:18:y:2000:i:5:p:567-574