Modelling the dynamics of design error induced rework in construction
Peter Love,
Purnendu Mandal,
Jim Smith and
Heng Li
Construction Management and Economics, 2000, vol. 18, issue 5, 567-574
Abstract:
Rework that is experienced in construction projects is often caused by errors made during the design process. Factors that contribute to design errors are identified and used to design and develop a systems dynamics model, which is used to simulate a number of practical scenarios that can be used to reduce design errors and rework. The model presented in this paper can enable design and project managers to understand better the process of design documentation and how design errors occur in construction projects.
Keywords: System Dynamics Design Management Time Boxing Design Errors Rework (search for similar items in EconPapers)
Date: 2000
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/014461900407374 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:18:y:2000:i:5:p:567-574
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/014461900407374
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().