EconPapers    
Economics at your fingertips  
 

Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change

David Moore and Andrew Dainty

Construction Management and Economics, 2001, vol. 19, issue 6, 559-562

Abstract: The success of the design and build (D&B) procurement route could be undermined by issues arising from the rigid professional cultures of individual participants within project workgroups. These have the potential to inhibit the achievement of a key espoused benefit of D&B procurement, i.e. that it promotes the integration of the design and construction processes for improved project performance. Cultural non-interoperability is identified as a significant potential barrier to effective change management, and to the achievement of innovation within the design and construction processes. This note argues that project responsibilities, which currently are delineated along professional identity lines, produce design and construction solutions that fail to fulfil the potential of D&B procurement. It is suggested that addressing cultural interoperability will require a fundamental and long term reshaping of the industry's structure, beginning with the professional bodies and the higher education system that underpins their future membership.

Keywords: Professional Cultures Interoperability Performance Improvement Design And Build Allow Approx Picas (search for similar items in EconPapers)
Date: 2001
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190110055508 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:19:y:2001:i:6:p:559-562

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190110055508

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:19:y:2001:i:6:p:559-562