EconPapers    
Economics at your fingertips  
 

Schedule-dependent evolution of site layout planning

Emad Elbeltagi, Tarek Hegazy, Abdel Hady Hosny and Adel Eldosouky

Construction Management and Economics, 2001, vol. 19, issue 7, 689-697

Abstract: The appropriate layout of temporary facilities on a construction site has a large impact on construction safety and productivity. For the duration of a project the site layout may need to be efficiently re-organized at various intervals to satisfy the schedule requirements and to maintain site efficiency. This paper presents a practical model for schedule-dependent site layout planning in construction. The proposed model uses a combination of artificial intelligence tools (knowledge-based systems, fuzzy logic, and genetic algorithms) to generate, optimize, and re-organize the site layout plan at frequent intervals during the project. The model incorporates flexible representation of irregular site shapes and several options for placing facilities. Based on the proposed model, an automated system is developed, fully integrated with widely used scheduling software. At each schedule interval, the system recalculates the space requirements and, for the convenience of congested sites, can utilize parts of the constructed space to accommodate temporary facilities. Details of the schedule-dependent model are described, and its application in an actual case study project is presented to demonstrate its capabilities.

Keywords: Site Layout Quantitative Evaluation Material Flow (search for similar items in EconPapers)
Date: 2001
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190110066713 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:19:y:2001:i:7:p:689-697

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190110066713

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:19:y:2001:i:7:p:689-697