The predictive ability of Bromilow's time-cost model: a comment
Russell Kenley
Construction Management and Economics, 2001, vol. 19, issue 8, 759-764
Abstract:
The study of the relationship between construction time and cost has a long history. This paper reviews the report of Ng, S.T., Mak, M., Skitmore, R.M., Lam, K.C. and Varnam, M. (2001) Construction Management and Economics, 19, 165, and reveals they have made a substantial contribution to the method of analysis but that they have not sufficiently justified their case in light of the literature, and have not understood the role of sample sizes and confidence limits in the interpretation of their results. In particular, the present paper challenges their conclusion that a long term trend of improvement has been identified. This debate raises important epistemological questions for forecasting and modelling trends using generic time-cost models.
Keywords: Time Cost Construction Performance (search for similar items in EconPapers)
Date: 2001
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190110073490 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:19:y:2001:i:8:p:759-764
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190110073490
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().