Scheduling system for high rise building construction
David Arditi,
Pirasak Sikangwan and
Onur Tokdemir
Construction Management and Economics, 2002, vol. 20, issue 4, 353-364
Abstract:
A computerized system to schedule high-rise building construction has been developed using line-of-balance technology assisted by an expert system. A review of the recent literature on the techniques available for scheduling and controlling construction projects of a repetitive nature shows that Gantt charts are inadequate, and that there are serious problems with using network methods in such circumstances. There is evidence that the construction of high rise buildings has a decidedly repetitive nature but differs in some respects from other repetitive projects such as pipelines or pavement construction. Two new concepts have been introduced into line-of-balance methodology to accommodate the special conditions encountered in high rise building construction. These two concepts, namely 'flexible' unit networks and 'multi-level' LOB diagrams have been coded into a scheduling module ('Lobplans'). A series of databases have been compiled regarding the productivity of resources. An expert system module (Lobex) has been developed to facilitate decision-making at network generation level. The scheduling module, the databases, and the expert system have been organized into an integrated system (Chriss) by means of communication and command routines that interface between the modules and the user input. A 16-storey building project has been used in testing Chriss' performance. The integrated system proved to be user friendly and reliable.
Keywords: Linear Scheduling Methods; Line-OF-BALANCE; Networks; High Rise Building Construction; Expert Systems (search for similar items in EconPapers)
Date: 2002
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190210131647 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:20:y:2002:i:4:p:353-364
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190210131647
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().