Theoretical comparison of alternative delivery systems for projects in unpredictable environments

Nuno Gil, Iris Tommelein and Glenn Ballard

Construction Management and Economics, 2004, vol. 22, issue 5, 495-508

Abstract: A project delivery process simulation is presented based upon empirical studies in the design-build environment of semiconductor fabrication facilities ('fabs'). The model captures key tasks and decisions in design, procurement and construction, as well as design criteria changes along the delivery of a R&D fab utility system. Simulation shows that to involve the specialty contractor from the project start on average expedites project delivery since it prevents delays caused by bidding and by contractors' unfamiliarity with the design product definition. Yet, in unpredictable project environments - environments in which design criteria are likely to change irrespectively of the project progress status - simulation reveals that the averages of construction rework and waste increase if design is prematurely frozen. Assuming that work methods do not change and design criteria remain uncertain, results indicate that a system that combines early contractor involvement with judicious postponement of the design start reduces the average duration of the fab utility delivery in relation to the expected duration if competitive bidding was used, with limited increase in the averages of construction rework and waste. Additional efficiency is gained when specialty contractors relax conservative assumptions on anticipated site conditions. An economic model uses simulation results to assess the tradeoffs between alternative project delivery systems for the case of R&D fabs.

Keywords: Specialty contractor; simulation; change; postponement; facility delivery compression (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190310001649100 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:22:y:2004:i:5:p:495-508

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190310001649100

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:22:y:2004:i:5:p:495-508