Grey relation analysis of causes for change orders in highway construction
Chao-Hui Wu,
Ting-Ya Hsieh,
Wen-Lon Cheng and
Shih-Tong Lu
Construction Management and Economics, 2004, vol. 22, issue 5, 509-520
Abstract:
Change orders issued during the construction of the second national highway in Taiwan have been categorized depending on whether they originate from owner, design consultant, on-site contractor unit, or external parties. A total of 34 change order causes are found for this construction project. Grey relation analysis (GRA) was used in this study, and change orders in the second national highway construction project in Taiwan are characterized by the following conclusions: (1) poorly executed design drawings, policy changes and new management requirements are not important causes of change orders; and (2) more roadways should be designed as viaducts to avoid levying more land and negotiating with landowner.
Keywords: Change orders; entropy method; Grey relation analysis; highway construction; Taiwan (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/0144619042000202735 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:22:y:2004:i:5:p:509-520
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/0144619042000202735
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().