EconPapers    
Economics at your fingertips  
 

Scheduling system with focus on practical concerns in repetitive projects

I-Tung Yang and Photios Ioannou

Construction Management and Economics, 2004, vol. 22, issue 6, 619-630

Abstract: The line of balance (LOB) method has long been used to model construction projects with repetitive units. Critics, however, indicate two major shortcomings of applying LOB in the construction industry: (1) it has not yet been adapted to numerical computation as readily as network methods; and (2) it relies on restrictive assumptions and therefore cannot treat the practical concerns concluded in this paper. To treat all the practical concerns and provide necessary calculation power, a new scheduling system is proposed: the Repetitive Scheduling Method (RSM) and its computerized implementation, Repetitive Project Planner (RP2). RSM includes necessary modelling elements (i.e. activity and relationship types) and a set of computational algorithm to calculate the start time of every activity as well as the minimum project duration. RP2 automatically calculates and generates RSM diagrams that are particularly useful in serving as a test-bed for project managers to perform what-if analyses for different crew utilization strategies. A real-life pipeline project is used to demonstrate the application of RP2 and to compare that with the critical path method (CPM) and traditional LOB models.

Keywords: Repetitive project; work continuity; project management; what-if analysis; crew utilization strategy (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190310001649065 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:22:y:2004:i:6:p:619-630

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190310001649065

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:22:y:2004:i:6:p:619-630