Accelerating linear projects
Ahmed Hassanein and
Osama Moselhi
Construction Management and Economics, 2005, vol. 23, issue 4, 377-385
Abstract:
Scheduling linear repetitive construction projects, such as highways and pipelines, poses unique challenges due to maintaining crew work continuity. An efficient method is presented, developed to accelerate the delivery of this class of projects so as to meet a specified deadline with least associated cost. The method is simple and ensures crew work continuity. An iterative approach is employed, where, in each iteration, the project schedule is analysed and an activity is identified as the controlling activity. A controlling activity is an activity that if accelerated, would reduce project duration at least additional cost. Upon its identification, the method selects an expediting strategy that would reduce project duration, and the project is rescheduled. Several expediting strategies are considered, including working overtime, double shifts and weekends. The method is implemented in a prototype software that operates in a Windows® environment, providing a user-friendly graphical interface. It has an open architecture, enabling the user to actively participate in tailoring the generated schedule to suit the requirements of the project at hand. The proposed method accounts for incentives and liquidated damages to aid users in identifying the most cost-efficient schedule. A relational database model is implemented in Microsoft Access® to store typical crews and their associated productivity, as well as their availability dates. A project, drawn from the literature, is analysed to demonstrate the basic features of the proposed method and highlight its capabilities.
Keywords: Repetitive construction; acceleration; crew productivity; time-cost trade-off (search for similar items in EconPapers)
Date: 2005
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190410001673571 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:23:y:2005:i:4:p:377-385
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190410001673571
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().