Deterministic models for assessing productivity and cost of bored piles
Tarek Zayed and
Daniel Halpin
Construction Management and Economics, 2005, vol. 23, issue 5, 531-543
Abstract:
The assessment process of productivity and cost of bored pile construction is dictated by unseen subsurface obstacles, lack of contractor experience and site planning. These problems complicate the estimator's role in evaluating pile equipment productivity and cost. Current research discusses the assessment of piling process productivity and cost using the deterministic technique. Data are collected through questionnaires, site interviews and telephone calls to experts in various construction companies. Many variables have been considered in the piling construction process, such as pile size, depth, pouring method, soil type and construction method. Five deterministic models have been designated to assess productivity, cycle time and cost. The developed models are validated whereas 79% of the outputs have been predicted with more than 75% accuracy. Consequently, three sets of charts have been developed to provide the decision-maker with a solid planning, scheduling and control tool for piling projects. If a pile has 60' depth with φ-18 (18'' diameter pile) in clay soil using a 5' auger height, the cycle time is estimated as 56 and 65.5 minutes; however, productivity is 6 and 5 holes/day for dry and wet methods, respectively.
Keywords: Bored pile; cost; cycle time; deterministic models; productivity (search for similar items in EconPapers)
Date: 2005
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190500039911 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:23:y:2005:i:5:p:531-543
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190500039911
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().