Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia

Andreas Wibowo

Construction Management and Economics, 2005, vol. 23, issue 6, 621-630

Abstract: Applying the adjusted present value method enables the estimation of the general minimum traffic levels for the first year of operation required to make typical Indonesia's build, operate and transfer (BOT) toll road projects financially feasible. To determine the level, both average business risk as reflected by the opportunity cost of capital in the country's toll road industry, and project-specific risk as reflected by traffic risk in terms of ramp-up scale, ramp-up duration and catch-up extent are taken into consideration. Pessimistic and optimistic estimates reveal, respectively, that 18 000 vehicles per day (vhd) and 18 100 vhd are the minimum traffic levels under a low traffic risk scenario. This level increases particularly for optimistic estimate if traffic risk rises. To relax these high traffic requirements, the government should attempt to minimize traffic risk and average business risk or to provide financial supports. Sensitivity analysis results demonstrate that the threshold traffic levels are very sensitive to base tolls and construction cost.

Keywords: Adjusted present value; build-operate-transfer; Indonesia; toll road (search for similar items in EconPapers)
Date: 2005
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190500040901 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:23:y:2005:i:6:p:621-630

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190500040901

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:23:y:2005:i:6:p:621-630