EconPapers    
Economics at your fingertips  
 

The relationship between distribution of control, fairness and potential for dispute in the claims handling process

Ajibade Ayodeji Aibinu

Construction Management and Economics, 2006, vol. 24, issue 1, 45-54

Abstract: Parties' concern for fairness has been identified as one of the underlying causes of dissatisfaction and protracted dispute in the process for handling contractors' claims. Social psychology literature suggests that distribution of control over the various stages of any conflict resolution process is a factor that may influence concern for fairness. Despite the numerous studies in social psychology and management research, little or no attempt has been made to systematically investigate how distribution of control over the various stages of the process for handling a contractor's claims for delay and disruption could influence concern for fairness and potential for dispute. This should be a useful exercise in that it would suggest ways of reducing potential for disputes in construction project delivery. This study is an attempt to fill this research gap. Drawing on social psychology theory, this study proposes that, in order to enhance perceived fairness and thereby reduce potential for dispute, (1) the claims certifier needs to exercise a higher degree of process and content control over the early stages of process for handling claims than the control exercised by the employer and contractor; (2) the claims certifier must exercise total decision control so as to enhance the perceived impartiality and neutrality of the decision rendered on the claims. By examining two litigated cases, the study illustrates the relationship between distribution of control, perceived lack of fairness and dispute potential. By adopting the proposed principle for distributing control into the claims handling process and coupled with the use of an independent claims certifier, potential for dispute could be reduced on construction projects.

Keywords: Claims; delay and disruption claims; claims process; control; fairness; dispute (search for similar items in EconPapers)
Date: 2006
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/14697010500226954 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:24:y:2006:i:1:p:45-54

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/14697010500226954

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:24:y:2006:i:1:p:45-54