EconPapers    
Economics at your fingertips  
 

Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects

Hong Zhang, Heng Li and C. M. Tam

Construction Management and Economics, 2006, vol. 24, issue 2, 159-169

Abstract: An alternative heuristic method for scheduling repetitive projects in which resources are limited and activities may be executed with multiple modes of resource demands associated with different durations is proposed. Unlike general heuristic methods that separately analyze each competing activity and schedule only one at a time, the proposed heuristic algorithm ranks possible combinations of activities every time and simultaneously schedules all activities in the selected combination leading to minimal project duration. All alternative combinations of activities in consideration of resource constraints, multiple modes and characteristics of the repetitive projects are determined through a permutation tree-based procedure. The heuristic method is implemented based on the corresponding framework. An example is presented to demonstrate the efficiency of the proposed heuristic method. The study is expected to provide an efficient heuristic methodology for solving the project scheduling problem.

Keywords: Scheduling; heuristic algorithm; repetitive projects; resource-constraints; multiple modes; a combination of activities (search for similar items in EconPapers)
Date: 2006
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190500184311 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:24:y:2006:i:2:p:159-169

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190500184311

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:24:y:2006:i:2:p:159-169