The determinants of the vertical boundaries of the construction firm: comment
Chen-Yu Chang
Construction Management and Economics, 2006, vol. 24, issue 3, 229-232
Abstract:
In recent years, the study of organizational issues has made a tremendous progress owing to the development of two powerful analytical theories - transaction cost economics (TCE) and the resource-based view (RBV). Both approaches have their strengths and limitations and thus researchers might think that synthesizing would be a way forward, Bridge and Tisdell (2004) being a case. In synthesizing TCE and RBV, several problems need to be overcome. First, there is a fundamental disparity in the basic assumption of rationality adopted by transaction cost economics (TCE) and. second, even after being operationalized for discovering the key determinants of the concept of competence, it still cannot escape the charge of tautology. Last, the inclusion of competence/resource and TCE-related variables may increase predictive power, but the potentially high correlation between asset specificity and rarity, as well as costliness to imitate, are likely to cause the multicollinearity problem that may reduce the reliability of estimators and hence disguise the true effect of each variable on construction contracting. Even if the critiques of tautology and multicollinearity can be technically overcome, ontological tension will remain.
Keywords: Subcontracting; transaction cost; competence-based approach (search for similar items in EconPapers)
Date: 2006
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190500516579 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:24:y:2006:i:3:p:229-232
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190500516579
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().