An automated model for materials management and control
R. Navon and
O. Berkovich
Construction Management and Economics, 2006, vol. 24, issue 6, 635-646
Abstract:
Current, manual, materials management and control procedures are unsatisfactory: they are labour intensive, inaccurate and error prone. The result is waste and surplus of materials, delays, decrease in productivity and lack of up-to-date, real-time information regarding the status of purchase orders (PO), the levels of inventory, the actual vs. planned usage of materials, and others. The purpose of the present work was to develop an automated model, which alleviates some of these problems. Prior to developing the model, a field survey was conducted to learn, at first hand, what the typical problems with materials management and control are. The model initiates materials purchasing, follows up the status of PO, records materials data as they arrive to the site and their movement around the site, makes recommendations, generates reports and issues warnings. The model was implemented, tested and evaluated in an ongoing building construction project. The onsite experiments confirmed that automated materials management and control are feasible, resulting in real benefits, such as time savings, and availability of up-to-date and accurate information regarding stocks of materials on site.
Keywords: Automation; data collection; feedback control; control methods; materials management; monitoring (search for similar items in EconPapers)
Date: 2006
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190500435671 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:24:y:2006:i:6:p:635-646
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190500435671
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().