EconPapers    
Economics at your fingertips  
 

Integrated duration-cost influence network for modelling risk impacts on construction tasks

Y. P. Poh and J. H. M. Tah

Construction Management and Economics, 2006, vol. 24, issue 8, 861-868

Abstract: Quantitative risk analysis is usually ignored in construction risk management, although numerous techniques are available. One of the shortcomings of conventional quantitative risk analysis techniques is that they can only analyse either duration or cost risks. In view of this, an integrated duration-cost influence network that systematically represents the interdependencies among the duration and cost parameters of a construction task has been developed, and mathematical equations have been formulated to represent the dependencies. The generic structure of the influence network can be used for explicitly modelling risk impacts affecting any construction task, and the nature of risks can be investigated in the risk modelling process. In addition, risk impacts modelled can potentially be propagated through the influence network for quantifying the risk-adjusted task duration and cost simultaneously. Thus, the influence network provides the basis for performing integrated duration-cost risk modelling and simulation in future research.

Keywords: Quantitative risk analysis; integrated duration-cost influence network; risk factors; risk modelling; risk propagation (search for similar items in EconPapers)
Date: 2006
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190600658891 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:24:y:2006:i:8:p:861-868

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190600658891

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:24:y:2006:i:8:p:861-868