A survey of the payment mechanisms for transportation DBFO projects in British Columbia
Ahmed M. Abdel Aziz
Construction Management and Economics, 2007, vol. 25, issue 5, 529-543
Abstract:
In traditional project delivery systems, payment mechanisms provide compensation for the work performed using construction capital payments. In the alternative public-private partnership (PPP) systems, payment mechanisms follow the selected PPP system. For example, the build-operate-transfer system provides compensation based on project demand using real-tolls usage payments; the design-build-finance-operate (DBFO) system provides shadow-tolls usage payments; and the performance-based DBFO system provides compensation based on contractor's performance using service availability payments. Designing the payment structure is an important task where several factors have to be considered. This paper analyses the implementation of payment mechanisms in a number of DBFO transportation projects in BC, Canada, in terms of payment structure, payment types and characteristics, determination and funding. The analysis provides insights for the design of payment mechanisms. The analysis shows that more payment types are being used and that the mechanisms are designed to achieve specific government objectives. The analysis refers to a new 'hybrid' payment mechanism with elements derived from the traditional and the PPP systems. The hybrid system may have potential to minimize the overall project cost; however, agencies have to be flexible in the delivery concepts as combinations of payments for inputs, usage and services might have to be used.
Keywords: Contracting; infrastructure; payment mechanism; project delivery; DBFO (search for similar items in EconPapers)
Date: 2007
References: View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190601161465 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:25:y:2007:i:5:p:529-543
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190601161465
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().