Alternative work schedule interventions in the Australian construction industry: a comparative case study analysis

Helen Clare Lingard, Keith Townsend, Lisa Bradley and Kerry Brown

Construction Management and Economics, 2008, vol. 26, issue 10, 1101-1112

Abstract: Project-based construction workers in the Australian construction industry work long and irregular hours and experience higher levels of work-to-family conflict and burnout than office-based workers, giving rise to an interest in alternative work schedules as a means of supporting work-life balance. Alternative work schedules were implemented in four case study construction projects in Australia. Interventions differed between projects, with two implementing a compressed work week, and the others introducing reduced hours schedules (one of which was optional). Data were collected from each case study project, using various combinations of focus groups, surveys, interviews and daily diary collection methods. The results were mixed. The compressed work week appears to have been favourably received where it was introduced. However, waged workers still expressed concerns about the impact on their weekly 'take-home' pay. Attempts to reduce work hours by changing from a six- to a five-day schedule (without extending the length of the working day between Monday and Friday) were less favourably received. Waged workers, in particular, did not favour reduced hours schedules. The results confirm the existence of two distinct labour markets operating in the Australian construction industry and markedly different responses to alternative work schedules, based upon whether workers are waged or salaried. The results clearly show that attempts to improve work-life balance must take the structural characteristics of the industry's labour markets into consideration in the design of interventions. The impact of alternative work schedules is likely to be moderated by institutional working time regimes within the construction industry.

Keywords: Work hours; alternative work schedules; work-life balance; labour market characteristics (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190802389402 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:26:y:2008:i:10:p:1101-1112

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190802389402

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:26:y:2008:i:10:p:1101-1112