A compromise programming model for site selection of borrow pits

John-Paris Pantouvakis and Odysseus George Manoliadis

Construction Management and Economics, 2008, vol. 26, issue 5, 433-446

Abstract: Road fill construction requires soil for filling low areas; this soil is obtained from temporary mineral workings known as 'borrow pits' (BP). Between a number of possible BPs, the appropriate site should be selected based upon conflicting econo-technical and environmental criteria aiming at achieving optimal BP performance while minimizing the adverse impacts to human and natural resources. For solving this problem a model for BP selection has been developed by this research using compromise programming (CP). The model incorporates a hierarchical structure integrating criteria and sub-criteria whose relative importance is set by the decision makers. Possible alternative BP sites are subsequently assessed on all these sub-criteria. Based upon this analysis, the model determines the distance of each of the possible alternatives from the utopia (ideal) point; the option with the minimum distance is considered the best compromise. The relevant concepts are exemplified through the presentation of a case study concerning the BP site selection for an Egnatia Motorway section in northwest Greece. The main conclusion that can be drawn from this work is that the CP approach is appropriate and valid for BP selection and, furthermore, it may also be used for other multiple objective construction-related site selection problems.

Keywords: Multiple objectives; decision making; compromise programming; borrow pits (search for similar items in EconPapers)
Date: 2008
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190801953299 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:26:y:2008:i:5:p:433-446

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190801953299

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:26:y:2008:i:5:p:433-446