A quasi-experimental evaluation of partnering
Johan Nystrom
Construction Management and Economics, 2008, vol. 26, issue 5, 531-541
Abstract:
Construction managerial literature often argues that there are gains to be made by using partnering. Voices have however been raised to approach partnering in a more neutral perspective and with well-founded methods of evaluation. This study can be seen as an outcome of the criticisms against earlier empirical evaluations by setting out to provide more tangible data and an improved method for evaluating partnering. A quasi-experimental method has been adopted in order to control for other affecting variables and find the unique effect of partnering. This approach strives to match partnering projects with identical non-partnering projects on every relevant variable except partnering. Six hundred and twenty three site meeting minutes from 20 publicly procured projects have been analysed to extract differences between partnering and non-partnering projects concerning cost and quality. Time delays, the amount of disputes, financial outcome and contract flexibility have been used as indicators. The paper has made a first attempt in trying to push the frontier for partnering evaluations forward by providing a new type of data (site meeting minutes) and applying a well-reputed evaluation method (quasi-experiment). The main result is that no systematic or general trends can be seen in the material. This result casts a shadow over the optimistic results from earlier evaluations and suggests that the main contribution of partnering might lie in its intangible effects.
Keywords: Partnering; evaluation; research methods (search for similar items in EconPapers)
Date: 2008
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190802036144 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:26:y:2008:i:5:p:531-541
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190802036144
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().