Disorder considerations in resource-constrained scheduling
Symeon Christodoulou,
Georgios Ellinas and
Pooyan Aslani
Construction Management and Economics, 2009, vol. 27, issue 3, 229-240
Abstract:
A method is presented for allocating resources to construction activities and for scheduling construction projects under resource constraints by considering the effects that such resource limitations may have on the tendency of the activities (and the project in general) to fall into disarray and behind schedule. Resource-constrained scheduling problems (RCSP) are very common in real-life construction projects and because of their nature their numerical solution is computationally intensive. The method utilizes a measure of each activity's perceived level of disorder stemming from resource limitations. The proposed technique aims to optimize the number of resources assigned to the activities and to schedule the project so as to minimize the overall project's tendency to fall into disorder. The entropy-like metric used in the scheduling optimization is related to the ratio of required over-assigned resource units per activity, and its utilization allows a planner to take into consideration project disorder when planning a project. A case study and its mathematical framework help demonstrate the 'duration vs. disorder' trade-off analysis that planners should perform when considering possible activity resource assignments and the feasibility of these assignments in terms of induced disorder. The entropy optimization method proves to be a powerful project-planning metric.
Keywords: Resource allocation; resource-constrained scheduling; project planning; entropy (search for similar items in EconPapers)
Date: 2009
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190802635416 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:27:y:2009:i:3:p:229-240
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190802635416
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().