EconPapers    
Economics at your fingertips  
 

Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities

Mohammed Mubashir Ali and Ashraf Elazouni

Construction Management and Economics, 2009, vol. 27, issue 9, 839-856

Abstract: Projects of repetitive non-serial activities constitute a major category of construction projects which can be scheduled more conveniently using the line of balance (LOB) technique. Generally, scheduling activities such that the expenditures are always in balance with the available cash is a must to devise financially feasible schedules. The objective is to integrate a CPM/LOB model for a project of repetitive non-serial activities with a cash flow model and utilize the integrated model to devise financially feasible schedules. The genetic algorithms (GAs) technique is employed to maximize the profit at the end of the project under the constraints of available cash. The optimization of the integrated models was demonstrated using an example project of 15 activities carried out at five units. The CPM/LOB model was validated against the results of a dynamic programming model in the literature and further by conducting a sensitivity analysis of the results of the integrated model. Finally, the model offers an effective financial planning tool for projects of repetitive non-serial activities.

Keywords: Scheduling; repetitive construction; genetic algorithms; cash flow management; line of balance (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190903191764 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:27:y:2009:i:9:p:839-856

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190903191764

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:27:y:2009:i:9:p:839-856