The rhythms of project life: a longitudinal analysis of work hours and work-life experiences in construction

Helen Clare Lingard, Valerie Francis and Michelle Turner

Construction Management and Economics, 2010, vol. 28, issue 10, 1085-1098

Abstract: A diary data collection method was used to collect data from project-based construction workers in a large civil engineering construction project in Melbourne, Australia. Data capturing the number of hours worked, satisfaction with work-life balance and capacity to complete required tasks at work and at home were collected for 21 consecutive weeks. A strong correlation was found between hours worked each week and participants' work-life experiences. Data were subjected to time series modelling procedures and weekly work hours were found to significantly predict participants' capacity to complete tasks at work and at home, but not their satisfaction with work-life balance. The impact of work leading up to a major project milestone was found to increase the predictive capacity of the time series models, indicating that project events have a significant impact upon the work-life experiences of project-based workers. The period of intense work prior to the milestone (the opening of a new ramp on to an operating freeway) contributed significantly to an immediate reduction in capacity to complete tasks at home. Further time series modelling revealed that recovery opportunities associated with workers taking a short, temporary break from work can also contribute to improved work-life balance. It is proposed that construction organizations use the naturally fluctuating workloads implicit in project work to 'build' recovery opportunities into project schedules.

Keywords: Work hours; work-family balance; diary studies; project work (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.480977 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:28:y:2010:i:10:p:1085-1098

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446193.2010.480977

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:28:y:2010:i:10:p:1085-1098