EconPapers    
Economics at your fingertips  
 

Multi-objective particle swarm optimization for construction time-cost tradeoff problems

Hong Zhang and Heng Li

Construction Management and Economics, 2010, vol. 28, issue 1, 75-88

Abstract: Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various multi-objective optimization methodologies to determine an optimal set of activity methods with the objectives of minimizing project duration and total cost. A multi-objective particle swarm optimization that adopts a combined scheme for determining the global best of each particle is presented for solving the TCT problem. The candidate TCT solutions in terms of a set of construction methods for activities are represented through the multidimensional particles. The framework of the combined scheme-based multi-objective particle swarm optimization (CSMOPSO) is developed. Computational analyses are conducted to investigate the performance of the CSMOPSO, including comparison with other methods. This study is expected to provide an alternative solving methodology for the TCT problem and help contractors or engineers plan construction methods with optimal time-cost tradeoff.

Keywords: Time-cost tradeoff; multi-objective optimization; particle swarm optimization (PSO); construction methods (search for similar items in EconPapers)
Date: 2010
References: View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190903406170 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:28:y:2010:i:1:p:75-88

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446190903406170

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:28:y:2010:i:1:p:75-88