Cost modelling in underpinning projects
Jouko Lennart Lehtonen and
Juhani Matti Kiiras
Construction Management and Economics, 2010, vol. 28, issue 9, 985-995
Abstract:
Large refurbishment projects are characterized by highly varied costs from one project to another. In Finnish underpinning, only retrospective analysis of costs has been available for the owner's decision process. In order to develop tools for pre-tender cost estimating and for comparison of different design solutions and evaluation of tenders of the underpinning project, two different cost models have been developed for research. In both models developed, the minimum data required is the pile length. In the more detailed model, the assessment is based on the design solution, including known pile types and the load transfer classification. Both models are easy to use, and the percentage of explained variance is fairly good in the more detailed model.
Keywords: Cost modelling; refurbishment; underpinning (search for similar items in EconPapers)
Date: 2010
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.487537 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:28:y:2010:i:9:p:985-995
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2010.487537
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().