Revisiting the applicability of learning curve theory to formwork labour productivity
Abdulaziz Jarkas and
Malcolm Horner
Construction Management and Economics, 2011, vol. 29, issue 5, 483-493
Abstract:
The learning phenomenon has proved applicable in various industries, especially those associated with mass productions, such as aircraft and automobile assembly. The learning process in labour-intensive industries is assumed to be more significant in the sense that automated work is constrained by the fact that machines cannot benefit from previous experience and therefore would not 'learn' to run any faster or increase the rate of production. Several previous investigations into the applicability of learning curve theory to the construction industry proved the importance of this concept to labour productivity. Nevertheless, a thorough examination of the literature revealed a dearth of research into the effect of learning on the formwork operation of building floors. Consequently, the objective of this research is to explore the influence of recurring building floor configurations on formwork labour productivity. To achieve this objective, formwork labour inputs from 45 multi-storey in situ reinforced concrete building frames were collected and analysed using the straight-line learning curve model. The cumulative average input for each cycle, i.e. floor, and its associated cycle number were modelled using the least squares method. According to the learning curve theory, we expect the labour inputs to decrease by a certain percentage, as the cycle number increases. Based on the results obtained, there is very little evidence for that.
Keywords: Formwork; labour inputs; labour productivity; learning curve theory; learning phenomenon (search for similar items in EconPapers)
Date: 2011
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446193.2011.562911 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:29:y:2011:i:5:p:483-493
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2011.562911
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().