Multiple-project discount rates for cost-benefit analysis in construction projects: a formal risk model for microgeneration renewable energy technologies
Jacopo Torriti
Construction Management and Economics, 2012, vol. 30, issue 9, 739-747
Abstract:
The traditional economic approach for appraising the costs and benefits of construction project net present values involves the calculation of net returns for each investment option under different discount rates. An alternative approach consists of multiple-project discount rates based on risk modelling. The example of a portfolio of microgeneration renewable energy technology is presented to demonstrate that risks and future available budget for re-investment can be taken into account when setting discount rates for construction project specifications in the presence of uncertainty. A formal demonstration is carried out through a reversed intertemporal approach of applied general equilibrium. It is demonstrated that risk and the estimated available budget for future re-investment can be included in the simultaneous assessment of the costs and benefits of multiple projects.
Date: 2012
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2012.692165 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:30:y:2012:i:9:p:739-747
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2012.692165
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().